Project Number:

9018BAGI

Montclair Township Board of Education

Stair Replacement at Buzz Aldrin Middle School and George Inness Annex High School

Project Information:

Client:

Project Name:

Project Lead:

Project Description:

Montclair Township Board of Education

Stair Replacement at Buzz Aldrin Middle School and George Inness Annex High School

William Ross

The scope of the project includes, but is not limited to, the removal and replacement of the lower runs (Lower Level to First Floor) of three existing stairwells at Buzz Aldrin Middle School, and one existing stairwell at George Inness High School Annex.

Bid Information:

DPMC Qualification:

(C008) GENERAL CONSTRUCTION
(C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS (C029) STRUCTURAL STEEL & ORNAMENTAL IRON

Cost of Documents:

Bidding Requirements:

Bids will be accepted from a single general contractor for a lump sum bid as follows:


Bidders shall also either be prequalified for, or include documentations for prequalified
subcontractors for, the following listed classifications:

Schedule:

Drawings Available:

Friday, September 20, 2024

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Wednesday, September 25, 2024 at 12:00PM at 173 Bellevue Ave, Montclair, NJ 07043

Friday, October 18, 2024 at 11:30AM at 22 Valley Road, Montclair, NJ 07042

Commence Construction:

Substantial Completion:

Thursday, June 19, 2025

Friday, August 29, 2025